Ver.
CHAPTER 2. Installation of RRH-P4
2-70
© SAMSUNG Electronics Co., Ltd.
2600-00CTEIGAA
4.0
Table 2.8 Construction Status Checklist
Category
Check Items
Criteria
Result
Remarks
Pass Fail
System
Installation
System fixing status
(Vertical and horizontal)
Horizontal and vertical
locations
System arrangement
status
Horizontal and vertical
locations
Locking status and
standard compatibility of
bolts/nuts/washers
Visual inspection and magnet
test
External wiring and other
wirings
Visual inspection for twist,
array and arrangement
System cable installation
status
Checking twist, distortion and
installation status
External connector
connection
Visual inspection to check
poor contact
(Tightening status)
and others)
Visual inspection
Power
Acceptance
Equipment’s power
cable specification
Visual inspection
Rectifier
↔
System
Visual inspection
Cabling Status
Visual inspection for twisted
or entangled status
Damage of cable sheath
Visual inspection
System power connector
- Visual inspection to check
whether the power
connector is connected
normally without separation.
- Inspection for the power
connector shaking status
System input voltage
(BATT voltage)
Measurement by digital meter
(voltmeter)
External
interface
Optic Cabling Status
Visual inspection
Ground
Construction
Ground line standard
Visual inspection
Ground bar
↔
System
Visual inspection
Ground line cabling
status
Cabling status check
Termination treatment of
the ground line
(Pressure Terminal)
Visual inspection
Содержание Smart MBS RRH-P4
Страница 1: ...Ver 2600 00CTEIGAA 4 0 Smart MBS RRH P4 Installation Manual ...
Страница 116: ...Ver ANNEX B Feeder Line Work B 10 SAMSUNG Electronics Co Ltd 2600 00CTEIGAA 4 0 This page is intentionally left blank ...
Страница 158: ...Ver ANNEX F Standard Torque F 2 SAMSUNG Electronics Co Ltd 2600 00CTEIGAA 4 0 This page is intentionally left blank ...