Installation, operating and maintenance manual SKIT/S-DEB
3rd print version
page 68
11 – Maintenance
RWO GmbH
●
Marine Water Technology
●
Bremen
●
Germany
Issue 2014-04-10
turning it.
If present, press the second plug level also one by
4)
one onto the tappets of the connection nipples.
Then insert all plug stuffs again into the plug
5)
openings with a turn.
Thread the head plate on one side onto the plug
6)
stuffs so that two of the fastenings screws are also
threaded into the plate.
Screw winged nuts onto both fastening screws.
7)
Then thread the remaining plug stuffs and the
8)
remaining fastening screw.
Screw the wing nut onto the third fastening screw.
9)
Tighten all three wing nuts by hand.
10)
Close adsorber housing.
11.6.4
Place new lid seal onto flange and align in the
1)
groove.
Place the lid onto the container, insert all lid screws
2)
and tighten by hand (without spanner).
Tighten all screws with a spanner by one turn.
3)
Repeat the process with a half to full turn.
4)
Check if all screws are evenly tight.
5)
Close drain valve (pos. 27A).
6)
Mount venting line.
7)
Start the system and wait until water flows out of the
8)
venting line.
Close venting valve on adsorber lid.
9)
Check if the lid is tight.
10)
If not, check if the lid seal is correctly in the flange
11)
groove. If necessary, re-tighten the screws until the
lid is tight.