Installation Instructions ROTARY inground lifts SL230/SL235/SL2
50 • Release: 11/2013 • Page 8
3.3 Installation of the hydraulic cylinders
Tighten the hydraulic hoses at the cylinder before mounting the hydraulic cylinders and fix the free end for the
connection to the hydraulic unit temporarily on the basic executions with a cable tie as far as this hasn’t been done
already ex-works. Now install the hydraulic cylinders on the right and left side with the welded synchronization lever
into the installation cassette. For best results use an eye screw M20 (models up to 3500 kg capacity) or M24
(models with capacity 5000 kg), which will be screwed into the cylinder (fig. 5). These screws are not contained in
the scope of delivery.
The piston rod has not to be fixed against falling out during handling because of the depression. It may go out only
about 15 cm.
Fix the eye screw not on the basic execution!.
The hydraulic cylinder with the screwed on proximity switches prepared ex-works is to be
installed at the right side in driving direction. After the lifting in screw in the socket head screw for fixation of the
basic executions and tighten it lightly for the moment.
Содержание SL230RA-PE
Страница 25: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 25 ...
Страница 26: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 26 ...
Страница 27: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 27 ...
Страница 28: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 28 ...
Страница 29: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 29 ...
Страница 30: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 30 ...