Installation Instructions ROTARY inground lifts SL230/SL235/SL2
50 • Release: 11/2013 • Page 4
1.3 Installation site
The production-line lift is not equipped for the assembly in blast endangered rooms. The final placement has to be
taken from the architect´s plan. We recommend the workplace dimensions described in fig. 1.
Fig. 1
1.3 Electrical connection
Electrical connection and wiring is only allowed to be performed by an electro-technician with
consideration of the VDE guidelines and the guidelines of the local energy supplier. For the electrical connection
must be power supply with 3~/N+PE 400 volts, 50 Hz at installation site. The electrical fuse must be of quality T16
Amperes according to the German guideline VDE 0100. Feeding the supply occurs into the control box.
If there are only 3~/N+PE 230 volts available, the lift must be especially adapted at circuit board and motor
clamping. These adaptations are NOT included in this manual. You have to ask separately for these requirements!
The power supply connection may only be supplied by an electro-technician. In this case a
check of the protective earth with 10 Ampere and a high voltage check with 1000 Volt has to be carried out. This
check has to be remarked in the testing book owners manual.
Содержание SL230RA-PE
Страница 25: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 25 ...
Страница 26: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 26 ...
Страница 27: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 27 ...
Страница 28: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 28 ...
Страница 29: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 29 ...
Страница 30: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 30 ...