Installation Instructions ROTARY inground lifts SL230/SL235/SL2
50 • Release: 11/2013 • Page 18
7.5 SL235DOP
The drive-on-platforms of the SL235DOP are completely pre-assembled. For screwing the drive-on-platforms onto
the lifting cylinders first remove the round cover in the middle of drive-on-platform to get access to the screws.
Then lay down the drive-on-platforms on the right and left side of the lifting cylinders. Best you use for this a lifting
device.
Now lift the drive-on-platform onto the cylinders, screw in the hexagon-screws M20 and screw it up lightly for the
moment.
The drive-on-platform is now ready for the hydraulical lifting and lowering.
Now install the lighting system. Therefore push the cables through the cable pipe (
33,6).
Raise the lift to the upper position and insert the wire pipe inclusive the lighting cable from the bottom into the
opening at the basic guides.
Next put a srewed disk onto the thread of the wire pipes. Then put the wire pipe with the upper thread part M33x1.5
through the opening of the platform ground plate and counter with a second screwed disk. The cables now protrude
appr. 20 cm out of the platform ground plate. Pull the cables until they reach the connection points. Connect the
lighting-wire at the clamping box.
Now connect the electrical wires at the connection plugs of the control (see electrical wiring plan).
Raise the lift and fix the platforms on the cylinders with the hexagonal screws M20 tightly. The distance between
wire pipe and cylinder self-adjustes when lowering the first time.
7.5.1 SL235DOP-ALU
The drive-on-platforms of the Alu Track Lift are completely pre-assembled. First raise up the lift 60 cm.
Then push the carrierplates onto the cylinders and screw in the hexagon-screws M20 and screw it with 450 Nm
respectively M24 with 580 Nm.
In the front of the lift assemble the 350 mm long steel plates and in the back of the lift use the 2000 mm long steel
plates.
Now for screwing the drive-on-platforms onto the steel plates screw the hexagon-screws M10 (frontside) and M12
(backside) to the bottom of the drive on platform into the sliding blocks.
The drive-on platform is now ready for the hydraulical lifting and lowering (according hydraulic plan HP20410).
Now install the integrated lighting system. Therefore push the cables through the cable pipe (
33,6). Raise the lift
to the upper stop position and insert the wire pipe inclusive the lighting cable from the bottom into the opening at
the basic guides.
Next put a screwed disk onto the thread of the wire pipes. Then put the wire pipe with the upper thread part
M33x1.5 through the opening of the platform ground plate and counter with a second screwed disk. The cables
now protrude appr. 20 cm out of the platform ground plate. Pull the cables until they reach the connection points.
Connect the lighting-wires at the clamping box of both platforms.
Now connect the electrical wires at the connection plugs of the control (see electrical wiring plan EP20336).
Raise the lift and fix the platforms on the cylinders with the hexagonal screws M20 tightly. The distance
between wire pipe and cylinder self-adjustes when lowering the first time.
Содержание SL230RA-PE
Страница 25: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 25 ...
Страница 26: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 26 ...
Страница 27: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 27 ...
Страница 28: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 28 ...
Страница 29: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 29 ...
Страница 30: ...Installation Instructions ROTARY inground lifts SL230 SL235 SL250 Release 11 2013 Page 30 ...