Chapter 3 Accura 2350 Operation/Setup
Accura 2300/2350 User Guide
Page 120
ⓒ
2011 Rootech Inc. All Rights Reserved
Phase Sequence Setup
Depending on the selection in the "Wiring/load direction" setup menu, the setup range of "Phase sequence"
setup menu is determined.
(1) Wiring/load direction:
VLN (Right load, Line-to-neutral wiring)
Single-phase or three-phase measurement is possible by installing a single-phase module and selecting a
line-to-neutral phase. For three-phase measurement, three single-phase modules or two single-phase
modules are required, and group device settings for them are additionally required. Refer to "Chapter 4>
Setup Mode>Accura 2350-1P Group Device Setup" for group device setup.
1.1) Single phase measurement
Select the Line-to-neutral wiring.
Setup range [Line-to-neutral single-phase single-hole connection]
Содержание Accura 2300 Front
Страница 221: ......