4801-5164J
20 October 2021
42
RS-500 5K Walk-In Cooler Door Installation and Operation Manual
The new panels can be installed as follows:
1. Unroll the replacement panels. The front and back panels are made of a white anti-static material, whereas the center panel is
made of a clear material. The hook-and-loop fastener on the panels must face outward.
2. Ensure the panels are oriented so the front panel will face you when it is installed.
3. Raise the panels into the head unit. While still holding the other panels, route the back panel into position behind the leading
edge bar, then secure the panel's center tab to the center stud.
4. While still holding the front panel, route the center panel behind the leading edge bar and over the drive pipe. Use the
semicircular notch in the middle of the panel and the mark on the middle of the drive pipe to align the panel; if there is no
mark, measure the middle of the drive pipe, then mark the spot. Secure the panel to the drive pipe using the hook-and-loop
fastener sewn into the panel.
5. Raise the front panel into position, then secure the center tab to the center stud.
6. Pull the corners of the back panel upward, then secure the corresponding holes in the tabs to the studs. Ensure the hook-and-
loop between the studs is secure and has no slack.
7. Reinstall the metal plate on the inside panel using the wing nuts.
8. Repeat Step 5 on the front panel. The three panels should now be aligned.
9. Power the Smart Controller back on using the switch.
10. Engage Jog Mode, then raise the door until it is off the floor.
11. Reinstall the front tension pipe, then reinstall the back tension pipe.
12. Rotate the egress tracks back to the closed position.
13. Disengage Jog Mode, then raise the door to the fully open position.
14. Cycle the door several times to ensure everything functions properly.
15. Reinstall the head unit cover (if applicable).
16. Close and latch the head unit cover.