CTS60
Preparation for Use
1094.0006.60 2.5
E-7
2.2.3
Ensuring Electromagnetic Compliance (EMC)
In order to avoid electromagnetic interference, the instrument may only be operated with all covers in
place as they form part of the shielding for the instrument. Only appropriate shielded signal and control
cables (e.g. RF connecting cables) should be used.
2.2.4
Switching on the Instrument
The CTS60 is switched on by means of the power switch at the rear.