Maintenance and Care •
10
139
10.3 Logging maintenance activities
Cleaning, disinfecting, and other maintenance activities
can be logged in the meter. Make sure that all cleaning
activities are complete and the system is thoroughly dry
before switching on the meter.
To store cleaning information in the meter, proceed as
follows:
1
Touch
in the
Main Menu
to open the
Main
Menu 2
screen.
2
Touch
Maintenance
to open the screen for adding
comments.
3
Select the desired comment(s) from the list or
touch
to
enter
your
own
comment
via
keypad.
4
Once you have entered your comments, touch
to save the maintenance comments. The
Mainte-
nance Test
screen opens up.
5
Touch
to return to
Main Menu 2
.
You can add up to three comments. For details see
section “Adding comments” on page 54.
Main Menu
Review Results
Control Test
Patient Test
12:48 pm
09/18/13
Main Menu 2
Maintenance
Strip Lots
Profi ciency
Control Lots
Beeper
Linearity
Diagnostics
Linearity Lots
Admin.
12:48 pm
09/18/13
Add Comments
09/18/13
Cleaned Meter
12:48 pm
Maintenance Test
NEW BATTERY PACK
Cleaned Meter
12:48 pm
09/18/13
Содержание ACCU-CHEK Inform II
Страница 1: ...Accu Chek Inform II BLOOD GLUCOSE MONITORING SYSTEM Operator s Manual ...
Страница 3: ...0 4807839001 05 2013 09 EN Operator s Manual Version 5 0 A ACCU CCU CHEK HEK Inform II System ...
Страница 6: ...6 This page intentionally left blank ...
Страница 12: ...12 This page intentionally left blank ...
Страница 104: ...8 Proficiency Testing 104 This page intentionally left blank ...
Страница 160: ...12 General Product Information 160 This page intentionally left blank ...
Страница 174: ...A Appendix 174 Codabar Code 39 Code 93 Code 128 EAN 13 Interleaved 2 5 GS1 DataBar Limited PDF417 DataMatrix QR Code ...
Страница 206: ...D Supplement for Observed Test Sequence 206 This page intentionally left blank ...
Страница 210: ...Index 210 This page intentionally left blank ...
Страница 211: ...211 ...