GAHP-AR – Installation, start-up, use and maintenance manual
22
Edition:
2014-08
Parameter 0: reset of flame control unit. This may be necessary when the appliance is
switched on for the first time – see Paragraph 2.1 on page 15 – or after a long period of
inactivity – see Paragraph “PROLONGED PERIODS OF DISUSE”, on page 24.
You will need:
access to the electrical panel – see "Display and knob (encoder)" on
page 19.
To reset the flame control unit select menu 2, as indicated in "Access to board menus" on
page 20; then proceed as follows:
1.
The display shows
: press the knob to access the menu. The display
initially shows Parameter 0,
.
2.
Press the knob to bring up the flashing reset request:
.
3.
Press the knob again to carry out a reset of the flame control unit. The reset request
stops flashing, and the display shows
again. The reset operation has been
performed.
4.
To exit the menu, turn the knob clockwise until
is displayed, then press it
to return to the menu selection,
.
5.
To exit the menu selection and return to the normal visualisation of the parameters
of the appliance, turn the knob clockwise until
is displayed, and press it to
exit.
Parameter 1: other appliance warnings/errors reset. This is required to reset any warnings
and errors that may occur during operation of the appliance.
You will need:
access to the electrical panel – see "Display and knob (encoder)" on
page 19.
To carry out a board error reset, select menu 2 as described in "Access to board menus"
on page 20, and then:
1.
The display shows
: press the knob to access the menu. The display
initially shows Parameter 0,
.
2.
Turn the knob clockwise to display Parameter 1,
.
3.
Press the knob to display the flashing reset request:
.
4.
Press the knob again to perform a board error reset. The reset request stops
flashing, and the display shows
again. The reset operation has been
performed.
Содержание GAHP Line AR Series
Страница 6: ...GAHP AR Installation start up use and maintenance manual 2 Edition 2014 08 ...
Страница 30: ...GAHP AR Installation start up use and maintenance manual 26 Edition 2014 08 ...
Страница 52: ...GAHP AR Installation start up use and maintenance manual 48 Edition 2014 08 ...
Страница 61: ...Electrical installer section Ed 2014 08 57 Figure 22 Internal electrical wiring diagram ...
Страница 82: ...GAHP AR Installation start up use and maintenance manual 78 Edition 2014 08 ...