First start-up and maintenance section
Ed.
2014-08
67
SECTION 5 FIRST START-UP AND MAINTENANCE
In this section you will find the following information about the appliance:
•
Indications required by the authorized Robur Technical Assistance Centre (TAC) in
order to carry out the entire procedure of first activation of the appliance (see
Paragraph 5.1);
The entire procedure for first activation of the appliance consists in carrying out
the following (main) operating stages:
- preliminary verification of plant compliance;
- regulation of gas flow to the burners and switching on of the appliance;
- regulation of the operating parameters of the appliance via on-board electronic
board (or via a DDC, if the appliance is connected to a DDC).
•
Indications regarding maintenance operations of the appliance (Paragraph 5.2):
general observations and warnings; general indications regarding checks, controls and
cleaning operations to perform.
At the end of the section you will find instructions for changing the type of gas (an
operation for technical assistance).
Before proceeding with the operations described in this section, the installation
technician concerned is invited to read Paragraph 1.1 on page 3.
For a description of the appliance switching on and off procedures, refer to
paragraph 2.1 on page 15.
If the appliance is connected to a DDC (and the DDC is in controller mode), for the
phases of activation and deactivation of the appliance it is necessary to refer to the
two books dedicated to the DDC itself.
Содержание GAHP Line AR Series
Страница 6: ...GAHP AR Installation start up use and maintenance manual 2 Edition 2014 08 ...
Страница 30: ...GAHP AR Installation start up use and maintenance manual 26 Edition 2014 08 ...
Страница 52: ...GAHP AR Installation start up use and maintenance manual 48 Edition 2014 08 ...
Страница 61: ...Electrical installer section Ed 2014 08 57 Figure 22 Internal electrical wiring diagram ...
Страница 82: ...GAHP AR Installation start up use and maintenance manual 78 Edition 2014 08 ...