
Rinnai
35
RD
V 600_700 OIM
CONNECTING GAS
CONNECTING THE GAS SUPPLY
Firmly grasp the S/S flexi pipe
and bend at 90° approximately mid way to line up with the gas control valve inlet
then attach pipe to gas control valve and tighten. To assist there is a small spanner, located in the pouch that
contains the commissioning instructions which is located on the top of the PCB cover
.
LEAK TESTING
Turn gas back ON and leak test appliance connection.
Continue to “BURNER MEDIA INSTALLATION” on page 36.
When the gas connection is completed, ensure that the spanner is returned to the commissioning
instruction pouch, so that it can be available for the next installer / service person.
Use a soapy solution to test all gas connections. If a leak is present bubbles will form at the leak
point. When finished remove any residue with a rag. Prevent any soapy solution from coming in
contact with electrical components.
A
B
C
B
C
A
IMPORTANT
CAUTION
Содержание 650
Страница 47: ...Rinnai 47 RDV 600_700 OIM NOTES ...