HEATER ENGINE INSTALLATION
Step 4.
Zero Clearance Frame Installation
The frame serves three purposes:
•
Maintains the required clearances to combustibles
around the fire
•
Keeps the enclosure square and provides rigidity
above the fireplace
•
Allows for a thin profile frame and for the engine to slip
easily in and out of the enclosure
Carefully remove the contents from the carton and check to
ensure you have all contents as listed in the instruction
sheet supplied with the frame are present. If
ANY
damage
is evident or parts are missing
DO NOT
assemble the zero
clearance frame and contact your supplier for advice.
Assemble all four sides of the zero clearance frame
together in accordance with the instructions provided with
the frame, noting that the frame can be assembled for the
RVD600ER or RVD700ER using the same components.
Then secure the zero clearance frame
using the holes
provided to the inside of the frame opening on the top
and on both sides
tabs using appropriate fixings (not
provided).
Once the zero clearance frame
is secured in position
remove the bottom frame component of the zero clearance
frame
assembly as this part is only used to keep the
frame square during installation and is no longer required.
Step 5.
Install Cladding
The cladding
may now be installed, ensuring that the
cavity opening is cut flush to the inside edges of the zero
clearance frame
.
To assist with flue and electrical connections,
if possible leave any side cladding of the false
fire place open until the heater engine
installation is finalised.
RDV700ER
assembly
RDV600ER
assembly
H
H
J
I
?
?
Remove
K
L
H
E
H
H
I
J
H
K
L
H
HINT