
Rinnai
30
R
DV 600_700 OIM
HEATER ENGINE INSTALLATION
MASONRY INSTALLATION
Step 1.
Prepare Site
Step 2.
Unpack The Heater Engine
Step 3.
Masonry Flue Installation
Connect both the Ø 100mm exhaust pipe
and the Ø 75mm inlet pipe
flues to
the masonry cowl
/ co-linear to coaxial
adaptor
, noting that the larger
diameter pipe is for the exhaust, securing
both pipes to the cowl / co-linear to coaxial
adaptor firmly with pipe clamps
.
Feed the flexi-liner flue pipes down the
chimney ensuring that exhaust pipe
is
on the right when being viewed from the
front of the fireplace. Once the pipe ends
are accessible from fire place, the cowl /
co-linear to coaxial adaptor components
may then be secured and weather sealed
in place.
At the fire place attach both exhaust pipe
and inlet pipe
flues to the engines
spigot plate
, noting again that the larger
diameter pipe is for the exhaust, when
viewed from the front this will be to the
right. Secure both pipes to the spigot plate
firmly with pipe clamps
.
Read this manual thoroughly and gain a full understanding of the requirements before
undertaking installation.
Ensure gas supply to heater is turned off for the first stages of this instruction.
Step 1.
Step 2.
Masonry Flue Installation - p.30
Step 3.
Masonry Flue Installation - p.30
Step 4.
Positioning The Heater Engine - p.31
Step 5.
Connect Electrical Supply - p.31
Step 6.
Step 7.
Insert Heater Engine Into Fireplace - p.31
Step 8.
Securing The Heater Engine - p.31
Step 9.
CONNECTING THE GAS SUPPLY - p.35
Step 10. LEAK TESTING - p.35
Step 11. BURNER MEDIA INSTALLATION - p.36
Step 12. COMMISSIONING INSTRUCTIONS - p.39
Ensure the intended enclosure meets the requirements of the dimensions as stipulated in
“ENCLOSURE REQUIREMENTS” on page 22 and that gas and electrical supplies have been
prepared in accordance with the dimensions stipulated in “GAS SUPPLY” on page 24 and
“ELECTRICAL SUPPLY” on page 25.
In a masonry fireplace use a slurry of sand and cement to level the base as required.
The heater engine is supplied in one carton, check to ensure you have all
contents as listed under “BEFORE YOU START” on page 4 at the start of
this manual before proceeding. Carefully remove carton by removing the
straps and lifting the carton off the appliance. Remove all packaging
materials and check all components for damage. If
ANY
damage is evident
DO NOT
install or operate this appliance. Contact your supplier for advice.
Retain the cardboard
carton for use in the
“Positioning The Heater
Engine” on page 31.
A horizontal masonry installation MUST use a horizontal masonry terminal mount to affix the co-
linear adaptor and the horizontal wall terminal to the exterior wall.
IMPORTANT
IMPORTANT
HINT
Min 5000 / Max 8000
A
E
B
C1
A
F
D
B
A
C1
B
E
Min 600
From the top
the of heater engine
C2
A
B
C1
C2
D
A
A
B
E
E
F
IMPORTANT
Содержание 650
Страница 47: ...Rinnai 47 RDV 600_700 OIM NOTES ...