10
Rev 20A
Please ensure that the motor power cable is not plugged in at any stage before Step 8
Step 1 - Gate Preparation Before Adding
Your Sliding Gate Motor:
•
Ensure that the sliding gate is correctly installed.
•
The gate is horizontal and level and the gate can glide back and forth smoothly when
moved by hand before installing the Automatic Gate Opener.
•
Wheels and guide rollers should rotate easily and be free from dirt/grime.
•
Track should be flat, level and firmly affixed.
•
Any misalignment in the gate will affect performance of the automatic gate opener.
The gate should slide smoothly by hand before attempting to install the gate opener.
Step 2 - Motor Pad Footing (If Required):
•
The motor pad footing requires an area of no less than 450mm long x 300mm wide
and a minimum depth of 200mm (Standard requirement).
•
Ensure surface is level and parallel to the driveway
Mounting Plate Dimensions: