![Regulus IR 12 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/regulus/ir-12/ir-12_user-manual_1434395022.webp)
22
S 1.3 – Controller installation
The Controller is designed for installation on a DIN rail in a fuse board.
It may be installed by authorized staff only!
The controller, power supply unit and optional OpenTherm communication module shall be
installed close to each other (cf. the interconnection fig.). Prior to turning the Controller on,
the ADR rotation knob shall be pointed to “0”. Pay attention to the right polarity of power
supply and interconnection between the Controller and IR 1x OT module! The recommended
min. cross section for power supply wires is 0.75 mm
2
. The recommended cable for
connection between the Controller and IR 1x OT module is JYTY 0.5
Содержание IR 12
Страница 1: ...EN ver 1 9 IR 12 Heating Controller Users Guide Ver IR12_KRB Valid for FW 4 01...
Страница 51: ...51 RegulusRoute yes no Enabling RegulusRoute service status Service state...
Страница 54: ......
Страница 55: ......