12
|
Regency Horizon HZ30E-10 Gas Fireplace
|
12
installation
UNIT ASSEMBLY
PRIOR TO
INSTALLATION
The nailing Strips must be correctly positioned and attached before unit is
slid into position.
NAILING STRIPS
The nailing strips come attached to the unit. There is 1 plate on each side and
one on the bottom that can be folded out as required.
The side nailing strips are secured to the framing. The bottom
nailing strip is secured to the unfinished floor - if installing the unit directly
on the floor.
IMPORTANT NOTE
Framing depth measurement is noted with
the nailing strips set as far forward on the
firebox as possible. The nailing strips can
be adjusted back up to 3-1/8” to allow for
varying thicknesses in non-combustible
material & wall finishes.
Nailing Strips
INSTALLATION ACCESS PANEL
The unit is equipped with a removable access panel for pre-finish installation
of optional components - this panel is located on the lower front face.
1.
Remove 2 screws to remove access panel.
2.
Easier access to gas connection with panel removed.
3.
Install any optional components with access panel removed.
4.
Reinstall access panel with 2 screws - prior to installing any facing material
Note:
Access panel is no longer usable once facing material installed.
Installation Access Panel
Screw Locations
Содержание Horizon HZ30E
Страница 58: ...58 Regency Horizon HZ30E 10 Gas Fireplace 58 parts list 1 2 3 4 11 10 5 8 ...
Страница 60: ...60 Regency Horizon HZ30E 10 Gas Fireplace 60 notes ...
Страница 61: ...Regency Horizon HZ30E 10 Gas Fireplace 61 61 notes ...
Страница 62: ...62 Regency Horizon HZ30E 10 Gas Fireplace 62 notes ...