57
APPENDIX 11
PROCEDURE TO RE-CALIBRATE PUMP
1)
Enter 50 into the METER 2 CAL key on the Console.
2)
Place 3-way valve handle on Injection Pump for PROD 2 to recirculate position. (See Figure 9C).
3)
Place BOOM and MASTER switches ON. Place the OFF/MAN/AUTO switch for PROD 2 to MAN.
4)
Run pump until liquid appears from tank return hose. Place OFF/MAN/AUTO switch to OFF.
5)
Enter "0" into PROD 2 VOLUME key (or for product under test).
6)
Place tank return hose into measuring container.
7)
Place OFF/MAN/AUTO switch to MAN until 50 ounces of measured product is pumped. The number
displayed in PROD 2 VOLUME is the new METER 2 CAL.
8)
Enter this new METER CAL number in METER 2 CAL key.
9)
Enter "0" in PROD 2 VOLUME key.
10)
Place OFF/MAN/AUTO switch to MAN until 50 ounces of measured product is pumped.
11)
The number in PROD 2 VOLUME should be 49, 50, or 51. If not, repeat calibration procedures.
12)
Empty tank return hose into measuring container.
13)
Pour product caught in measuring container back into Injection Module Tank.
Содержание SCS 700
Страница 1: ...Installation Service Manual SCS 700 ...
Страница 2: ...W A R N I N G Disconnect console before jump starting charging battery or welding on equipment ...
Страница 3: ......
Страница 4: ... ...
Страница 58: ...54 APPENDIX 9 INJECTION MODULE MOUNTING INSTRUCTIONS 1 TYPICALMODULEDIAGRAM ...
Страница 64: ...60 APPENDIX 14 SCS 710 6 BOOM CONSOLE WIRING DIAGRAM ...
Страница 69: ......
Страница 70: ......