52
APPENDIX 8
TANK INJECTION MODULE INSTALLATION
1.
PLUMBING THE INJECTION MODULE
1)
Plumb Pressure Relief Valve (PRV), Flow Meter, Control Valve, Carrier Check Valve, Product Check
Valves, and In-line Mixer just ahead of the Boom On/Off Valves as shown in Figure 4.
2)
Mount Injection Modules close to the Boom On/Off Valves to minimize amount of product in tubing.
3)
Plumb output lines of Injection Modules to Product Check Valves (See Figure 23). Use 3/8 inch [10
mm] tubing on low volume modules and 1/2 inch [13 mm] tubing on high volume modules. Product
Check Valves and tubing not furnished.
FIGURE 23
Содержание SCS 700
Страница 1: ...Installation Service Manual SCS 700 ...
Страница 2: ...W A R N I N G Disconnect console before jump starting charging battery or welding on equipment ...
Страница 3: ......
Страница 4: ... ...
Страница 58: ...54 APPENDIX 9 INJECTION MODULE MOUNTING INSTRUCTIONS 1 TYPICALMODULEDIAGRAM ...
Страница 64: ...60 APPENDIX 14 SCS 710 6 BOOM CONSOLE WIRING DIAGRAM ...
Страница 69: ......
Страница 70: ......