background image

Retractable Flap Barrier Operation Manual 

 

11 

-  - 

 

 

6. 

Equipment 

Assembly 

and 

Installation 

Instruction 

1.

 

Installation Details 

 

Caution! 

Follow the safety requirements during the installation (see clause 3) 

Correct  turnstile  installation  provides  its  functionality  and  lifetime.  Please 

carefully study and follow the installation instructions. 

 

Caution! 

The  manufacturer  shall  not  be  liable  for  any  damage  caused  as  the  result  of 

improper  installation  and  declines  any  claims  arising  thereof  in  case  if  the 

installation  is  not  done  in  compliance  with  the  instructions  provided  in  this 

Manual. 

 

2.

 

Installation Procedure 

(1)

 

Prepare  the  tools  for  product  installation  and  Sort  out  the  auxiliaries  in 

accordance with the packing list; 

(2)

 

Determine the installation location in accordance with the system composition, 

operation mode, application site, and prepare to install after carrying out the system 

planning; 

(3)

 

As shown in Fig. 1 for the installation requirements, determine the installation 

hole location, bury before hand at the installation location 4*M12 ground screw 

bolts or 4*M12 inflatable screw bolts, As shown in Fig. 2; 

(4)

 

Sheath the strong power and weak power cables respectively with 3/4”PVC 

Содержание RMC-PRS-56E-PUN

Страница 1: ...Flap Turnstile Operation Manual 30E USER MANUAL Ravel Movement Control Pvt Ltd 150 A Electronics Industrial Estate Perungudi Chennai 600 096 Phone 91 44 2496 1004 Email info ravelmovement com...

Страница 2: ...blocking mechanism designed for very low maintenance The equipment is provided with a standard electric interface and is easily integrated into a system with write read facilities such as access cont...

Страница 3: ...netic requirements provided that the instructions on storage installation and operation are observed The warranty period is 12 twelve months commencing from the date of sale We will repair or replace...

Страница 4: ...h or residual current operated device is compulsory Before commissioning make sure all electrical and functional features are tested The electrical wiring of the Retractable Flap turnstile must comply...

Страница 5: ...All the cables should be connected up when the power supply is switched off from the ACmains Only serviceable tools should be used for installation Observe general electrical safety rules when laying...

Страница 6: ...n to prevent force intrusion until a valid open signal is received With automatic counting and counting function the number of people can be displayed which is convenient for real time inspection The...

Страница 7: ...ately stops moving and reverses back the service life is up to 100 200 million times Emergency escape function When power off it will be opened the gates automatically to meet the request of fire prot...

Страница 8: ...m Gate switching time less than 0 4S Passing speed normally open 50 people min normally closed 30 people min Communication interface RS485 Input voltage AC220 total power less than200W Communication d...

Страница 9: ...rol of theproduct 5 2 Equipment Operation Mode The turnstile provides bi directional access control Each direction may be in one of three states 1 Free passage all person are authorized to pass under...

Страница 10: ...Retractable Flap Barrier Operation Manual 10 Fig 1 The dimensions of Retractable Flap Barrier...

Страница 11: ...he installation is not done in compliance with the instructions provided in this Manual 2 Installation Procedure 1 Prepare the tools for product installation and Sort out the auxiliaries in accordance...

Страница 12: ...lect one of the products as a reference it is better to select the middle one as reference Align the hole for screw bolt at the chassis with the respective ground screw bolt Then tighten the nuts 8 Op...

Страница 13: ...trol system is mainly composed of reader main control board infrared sensor direction indicator counter alarm Devices voice boards limit switches transformers speakers etc the main components are as f...

Страница 14: ...achine communication detection normal display SERO serial ok enter the gate reset digital after the communication is normal The tube displays RESU RESUME reset If the reset time gate cannot be reset t...

Страница 15: ...a certain angle the gate will be further locked until the pedestrian exits to automatically unlock and reset this function is only for individual models PRECAUTIONS 1 The depth of the PVC tubes burie...

Страница 16: ...unless you can t do debugging 2 Function debugging 1 External entry opening signal and exit opening signal 2 Without valid access controller signal acoustic signal for announcement of unauthorised us...

Страница 17: ...y I N C is plus one key D E C is minus one key The entrance and exit of the menu are P 0 0 This menu is a circular menu The system runs the status code tube to display R U N X X is the working mode of...

Страница 18: ...the INC or DEC key to set the parameter INC increments the parameter value by 1 and decrements the parameter value by 1 5 Press SET to save the setting value and return to the menu function setting m...

Страница 19: ...can be accessed without reading a card 005 Incoming freedom outbound is prohibited the entrance does not need to read the card and the exit prohibits pedestrians frompassing 006 The entry is prohibite...

Страница 20: ...g menus have parameters for the main sub control board dP01 maximum operating speed of the gate The value is 0 16 the higher the value the higher the startup speed dP02 collision speed setting The val...

Страница 21: ...01 The value is 0 50 dP08 minimum operating speed of the gate The value is 0 10 the higher the value the higher the speed dP09 00 without clutch 01 with clutch normally open Non user menu Press and ho...

Страница 22: ...er is successfully restored After the setting is completed press the SET button to save the setting value and exit the setting Go back to setup mode NP03 default NP04 default NP05 default NP06 post de...

Страница 23: ...nd auxiliary boards are required 6 After the power is cut off the Retractable flap arm automatically opens the door 7 After the power is turned on the Retractable Flap arm automatically returns to the...

Страница 24: ...s corresponding to the label F Youcan also change the NP09 Valueto change the main and sub mode of the board 0 is dominant 1 is secondary 4 After the power is turned on the zero position of the gate i...

Страница 25: ...e forward and reverse rotation of the motor 8 after the system is set up the arm Retractable Flaps the chassis when the power is turned off and you cannot find the zero position yourself Solution 1 Ch...

Страница 26: ...ompt motor failure Solution Viewthe motor line sequence 10 Note 1 Without permission do not add peripherals on the device and ensure that the system is grounded reliably to ensure the safe and reliabl...

Страница 27: ...d as invalid if it has not been filled in details three guarantees and acknowledgment of receipt Please confirm whether the data filled in the three guarantees and acknowledgement of receipt is correc...

Страница 28: ...Retractable Flap Barrier Operation Manual 28...

Отзывы: