Retractable Flap Barrier Operation Manual
12
- -
tube, and bury them to the corresponding positions with concrete;
(5)
Move each cabinet to the respective installation position, and align with each
ground screw bolt;
Fig. 2 Ground Foot Installation Foundation Diagram
Notes:
(1). AC220V power supply line pipe: use RVV3*1.0 power supply cable.
(6)
Check the system composition and operation mode, and carry out the next
operation after confirming the above check;
(7)
Open the cabinet door, select one of the products as a reference. (it is better to
select the middle one as reference). Align the hole for screw bolt at the chassis
with the respective ground screw bolt. Then, tighten the nuts.
(8)
Open an adjacent cabinet door. Align the hole for screw bolt at the chassis with
the respective ground screw bolt and arrange properly on line with the reference
product. Then, tighten the nut preliminarily. The rest products, if any, are installed
just the same;
(9)
As shown in the connecting diagram of the system (Fig. 6, connect the power
line, control line to the connecting socket of the main controller board of the
turnstile, and connect properly the protection ground wire