Operation QUANTRON-A
31
4
4
Operation QUANTRON-A
4.1
Switching on the control unit
Requirements:
The control unit is connected properly to the mineral fertiliser spreader and
the tractor (for an example, see chapter
3.3: Connecting the control unit,
).
A minimum voltage of
11 V
is guaranteed.
n
CAUTION
Risk of injury due to ejected fertiliser!
In the case of a fault, the metering slider may open unexpectedly
during transportation to the spreading location. There is a risk of
slipping and personal injury due to ejected fertiliser.
Before leaving for the place of spreading,
make sure you
switch off the electronic QUANTRON-A control unit.
NOTICE
AXIS-M EMC (+W) only
The settings in the individual menus are very important for optimal
automatic mass flow control
.
Make sure you observe the following menu entries in particular:
In the
Fertiliser settings
menu
-
Spreading disc, see
-
PTO speed, see
.
In the
Machine settings
menu
-
AUTO/MANUAL operation, see
and chapter
NOTICE
The operating manual describes the functions of the QUANTRON-A control unit
from software version 3.30.00
.
Содержание QUANTRON-A
Страница 6: ...Table of Contents IV...
Страница 10: ...User instructions 1 4...
Страница 17: ...Layout and function 11 2 Figure 2 5 Control unit display MDS operating screen example 3 11...
Страница 26: ...Layout and function 2 20...
Страница 96: ...Operation QUANTRON A 4 90...
Страница 118: ...Index D...
Страница 120: ......