- 55 -
V08 en, SCC
Control of SSR steam element at 100% energy demand
Star connection 3(N)AC 400-480V
To check the heating elements in 100% energy demand:
Function test 100%
I=P / (1.73 x V)
e.g. I= 9000W/(1.73 x 400V) = 13A
Steam generator
safety thermostat 160°C
Thermocouple B5
12V DC
Violet
A1/B1
B2
A2
+
-
+
-
A
B
A1/B1 - A2 Steam / Dampf
A1/B1 - B2 Hot Air / Heißluft
A1/B1
B2
A2
+
-
+
-
A
B
L3
L2
L1
P
C
B
0V DC
Orange
Black
B5
12V DC
0V DC
SSR 100% power at 3NAC/400V
BK
OG
VT
X00
L3
R1
9kW(3x3kW)
Thermocouple B5
D1/D2
2
1
VT
4
3
BK
6
5
OG
V1
A1/B1
B2
A2
B-
B+
A-
A+
BK
BK
(HL2)
R2
9kW(3x3kW)
2
D1/D2
1
XV1
44
VT
4
3
33
BK
6
5
22
OG
(D1)
11
BK
V2
A1/B1
B2
B-
B+
A-
A+
A2
OG
OG
(HL1)
XV2
44
R4
18kW(6x3kW)
1
2
HL1/HL2
33
5
6
22
9
10
(D2)
11
OG
VT
3
4
BK
7
8
OG
11
12
HA2
HA1
ST1
ST2
VT
L1
L2
L3
V1 -
9
KW
V1+V2 - 18KW
Содержание CombiMaster Plus CM
Страница 1: ... V08 en SCC CMP 09 2018 Training Manual SelfCookingCenter SCC SCC_XS CombiMaster Plus CMP CM V08 ...
Страница 3: ... 3 V08 en SCC ...
Страница 10: ...V08 en SCC 10 Index E Index G Index H I Index I SCC XS ...
Страница 25: ... 25 V08 en SCC ...
Страница 64: ...V08 en SCC 64 SCC Service level pwd TECLEVEL Process is active ...
Страница 74: ...V08 en SCC 74 ...