
R&S ESU
Instrument Functions
Analyzer Mode
4.208
Operating Manual 1302.6163.12 - 03
Gated statistics configuration example:
A statistics evaluation has to be done over the useful part of the signal between t3
and t4. The period of the GSM signal is 4.61536 ms
The instrument has to be configured as follows:
4.8.13.5
Measurement of Carrier/Noise Ratio C/N and C/No
Using the carrier/noise measurement function, the R&S ESU determines the C/N
ratio which can also be shown normalized to a 1 Hz bandwidth (function C/No).
To determine the noise power, a channel at the set center frequency is examined.
The bandwidth of the channel is fixed by means of the
CHANNEL BANDWIDTH
function.
The largest signal in the frequency span is the carrier. It is searched when the func-
tion is activated and is marked by means of the
REFERENCE FIXED
marker. The
noise power of the channel is subtracted from the signal level obtained (C/N), and in
the case of a C/No measurement it is referred to a 1 Hz bandwidth.
There are two methods for measuring the carrier/noise ratio:
1. The carrier is outside the channel examined:
In this case, it is sufficient to switch on the desired measurement function and to
set the channel bandwidth. The carrier/noise ratio is displayed on the screen.
t1
External positive trigger slope
t2
Begin of burst (after 25 µs)
t3
Begin of useful part, to be used for statistics (after 40 µs)
t4
End of useful part, to be used for statistics (after 578 µs)
t5
End of burst (after 602 µs)
Trigger Offset
t2 - t1 = 25 µs now the gate ranges are relative to t2
Range 1 Start
t3 - t2 = 15 µs start of range 1 relative to t2
Range 1 End
t4 - t2 = 553 µs end of range 1 relative to t2
Содержание 1129.7246.03
Страница 1: ...R S ESU EMI Test Receiver Operating Manual 1302 6163 12 03 Test Measurement Operating Manual ...
Страница 25: ......
Страница 27: ...R S ESU Putting into Operation 1 2 Operating Manual 1302 6163 12 03 ...
Страница 29: ...R S ESU Getting Started 2 2 Operating Manual 1302 6163 12 03 ...
Страница 31: ...R S ESU Manual Operation 3 2 Operating Manual 1302 6163 12 03 ...
Страница 349: ...R S ESU Instrument Functions Basic Settings 4 318 Operating Manual 1302 6163 12 03 ...
Страница 405: ...R S ESU Instrument Functions User Port 4 374 Operating Manual 1302 6163 12 03 ...
Страница 439: ...R S ESU Remote Control Basics Status Reporting System 5 34 Operating Manual 1302 6163 12 03 ...
Страница 821: ...R S ESU Remote Control Programming Examples More Complex Programming Examples 7 32 Operating Manual 1302 6163 12 03 ...
Страница 841: ...R S ESU Error Messages Device Specific Messages 9 10 Operating Manual 1302 6163 12 03 ...
Страница 854: ...Operating Manual 1302 6163 12 03 10 13 R S ESU ...
Страница 855: ...R S ESU 10 14 Operating Manual 1302 6163 12 03 ...