38/118
This document and the information contained herein, is the exclusive property of R&M Materials Handling Inc. and represents a non-public, confidential and proprietary trade
secret that may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials
Handling Inc. Copyright 2020 © R&M Materials Handling Inc. All rights reserved.
5.1
Installation preparations
The product is packed in a box for transportation. Before starting to install the hoist, visually check that the package
in which the product has been delivered to you is intact. Also check that the content of the delivery matches with
your order. If not, contact your supplier.
To remove the hoist from the box, first remove the temporary transport supports. The chain bucket is not fixed to
the hoist during transportation, so lift the hoist and the chain bucket from the box simultaneously. Note that the
chain connects the bucket and the hoist.
IMPORTANT:
If the hoist is used in outdoor conditions, drill a D10 mm sized hole to the
bottom of the chain bucket to allow for water to drain. If water is able to collect
to the inside of the chain bucket, it can cause damages to the hoist and the
chain.
Do the drilling when the hoist is installed, before the chain is placed to the
chain bucket, to avoid damaging the chain. The draining hole can only be
drilled to chain buckets that are made of hard plastic and steel. It is not
possible to use it with chain bags that are made of the soft canvas material.
WARNING
Do not bundle the chain into the chain bucket.