72/118
This document and the information contained herein, is the exclusive property of R&M Materials Handling Inc. and represents a non-public, confidential and proprietary trade
secret that may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials
Handling Inc. Copyright 2020 © R&M Materials Handling Inc. All rights reserved.
1
Ensure that everything is ready for lifting.
2
If the hoist has a horn, push the horn
pushbutton to warn people nearby that a load
is about to be moved.
3
Gently push the UP pushbutton to slowly take
up the slack from the chains or sling before
lifting the load from the ground.
4
Continue to push the UP pushbutton until the
load is just clear of the ground.
5
Push the UP pushbutton to lift the load at high
speed.