55/118
This document and the information contained herein, is the exclusive property of R&M Materials Handling Inc. and represents a non-public, confidential and proprietary trade
secret that may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials
Handling Inc. Copyright 2020 © R&M Materials Handling Inc. All rights reserved.
6.6
After test runs
1
Visual check
Check visually that the hoist or any other part has not been damaged in any way during
commission testing.
2
Cleaning
Check that all tools and materials used during installation are removed from the hoist and the
track.
3
User training
Ensure that the hoist operator and supervision personnel are aware of the need for user training.
The authorized service organization of the hoist manufacturer can arrange user training by
separate agreement.
4
Handover documents
Check the documents delivered with the hoist. Check that you have received the needed
documentation for the use of the product (e.g. user instructions). Ensure that the entries in the
delivered documents are properly recorded and that the reference data in the documentation
matches that on the type rating plates of the product.
Compile a commissioning log for the hoist and store it together with the other documentation for
the hoist.