Observation of System Operation
Observe the system operation for at least 10 pump cycles to ensure everything is working.
If the well influx is low so the pump seldom cycles, pour clean water into the well to check
on the pump. If allowed, the pump discharge can be directed into the well so the pump will
cycle within an acceptable period to allow for observance of operation. Check your local
regulations to determine if these practices are permissible.
Note:
The Pump Cycle Counter may have to be readjusted if it is set when the
water is recirculating to the well.
After the entire site is operating, return to each well to ensure that the pump and PCCs are
functioning properly. The addition of other pumps and possible system back pressure can
necessitate air pressure and counter readjustment.
Downwell Testing of the AutoPump
While the AutoPump is in the well, it can be tested by putting compressed air into the exhaust
hose of the pump.
Note:
The air supply hose must be shut off or pressurized when this is done.
The compressed air will enter the pump through the exhaust valve and push any fluids in the
pump up the discharge tube. If sufficient compressed air is continually supplied, it will also
exit the discharge tube and cause the fluid in the discharge hose to be airlifted to the surface.
This method can be used to lighten the pump and hoses before removing the pump from the
well. This process can also show whether the fluid inlet check valve is sealing and if the pump
is capable of discharging fluid.
AutoPump Shutdown while Submerged
The AutoPump can be submerged for long periods of time at most sites. If the well
environment is such that deposition occurs on stainless steel parts, the operator may wish to
raise the pump above the water level during a shutdown of the system.
Содержание AutoPump AP-2
Страница 15: ...Page 7 AP 2 Manual Revision 7 August 2007 Figure 1 How it Works Chapter 2 Overview 601345...
Страница 17: ...Page 9 AP 2 Manual Revision 7 August 2007 Figure 2 Overview of the AutoPump System Chapter 2 Overview...
Страница 22: ...QED Environmental Systems AP 2 Manual Page 14 Figure 3 Long and Short Bottom Loading AP 2 BL...
Страница 23: ...Page 15 AP 2 Manual Revision 7 August 2007 Chapter 3 Equipment Figure 4 Long and Short Top Loading AP 2 TL...
Страница 32: ...QED Environmental Systems AP 2 Manual Page 24 Figure 7 Locking Quick Connects...
Страница 34: ...QED Environmental Systems AP 2 Manual Page 26 Figure 9 AP 2 Assembly Well Cap with Holes...
Страница 38: ...QED Environmental Systems AP 2 Manual Page 30 Figure 11 Examples of Well Caps...
Страница 40: ...QED Environmental Systems AP 2 Manual Page 32 Figure 12 Hose Bundling Part 1 of 2...
Страница 53: ...Page 45 AP 2 Manual Revision 7 August 2007 Chapter 6 Maintenance Figure 14 Removing AP 2 Pump Casing...
Страница 54: ...QED Environmental Systems AP 2 Manual Page 46 Figure 15 Exploded view of a Long Top Loading AutoPump AP 2...
Страница 56: ...QED Environmental Systems AP 2 Manual Page 48 Figure 17 Exploded View of a Long Bottom Loading AutoPump AP 2...
Страница 58: ...QED Environmental Systems AP 2 Manual Page 50 Figure 19 Exploded View of AP 2 Lever Assembly...
Страница 82: ...QED Environmental Systems AP 2 Manual Page 74 Figure 29 Conversion From Top Loading to Bottom Loading AutoPump...
Страница 102: ...QED Environmental Systems AP 2 Manual Page 94 Figure 37 Pump Cycle Counter with Magnetic Reed Switch...
Страница 109: ...Page 101 AP 2 Manual Revision 7 August 2007 Log Notes...
Страница 110: ...Clean Environment Equipment AP 2 Manual Page 102...
Страница 111: ...Page 103 AP 2 Manual Revision 7 August 2007 Log Notes...