QED Environmental Systems
AP-2 Manual
Page 56
4. Fluid Inlet Clogged
:
• If the fluid inlet screen is clogged with debris, or if a Bottom-Loading pump is on the
bottom of the well, water cannot enter the pump.
5. Debris, Scale, or very Viscous Fluid
:
• If debris, scale or a very viscous fluid has accumulated inside the pump, the float
may not move freely up and down, or the control rod may not slide easily through
the float.
• Clean the float, control rod, and the casing. See
Chapter 6
for cleaning instructions.
6. Float Pins
:
• Determine if any part of the float foam itself can contact the discharge pipe. Move
each end of the float back and forth, sideways, to ensure that the pins on the plate
of the float prevent float foam contact with the pipe. Call
QED
for repair options.
Note:
If viscous materials cause continual problems, contact QED for possible
solutions.
7. Debris in Air Inlet Valve
:
• Open the pump. Connect the air supply. Adjust the air pressure to 40 psi. Pull the
control rod down. Listen to determine if significant volume of air leaks through. A
leak rate of 4 SCFH or less is within specification (this is a small leak that produces
bubbles in a soapy water solution). If so, clean the valve by blowing air or water
through it from both ends.
• If air still leaks through the valve with the control rod down, the air-hose must be
removed to access the valve inlet to check for debris in the valve or in the hose
pigtail.
• Push the rod upwards. If little or no air passes through, remove the air-in hose to
access the valve inlet. Blow air through the valve from the poppet side to clear debris
from the ball and seat.
Содержание AutoPump AP-2
Страница 15: ...Page 7 AP 2 Manual Revision 7 August 2007 Figure 1 How it Works Chapter 2 Overview 601345...
Страница 17: ...Page 9 AP 2 Manual Revision 7 August 2007 Figure 2 Overview of the AutoPump System Chapter 2 Overview...
Страница 22: ...QED Environmental Systems AP 2 Manual Page 14 Figure 3 Long and Short Bottom Loading AP 2 BL...
Страница 23: ...Page 15 AP 2 Manual Revision 7 August 2007 Chapter 3 Equipment Figure 4 Long and Short Top Loading AP 2 TL...
Страница 32: ...QED Environmental Systems AP 2 Manual Page 24 Figure 7 Locking Quick Connects...
Страница 34: ...QED Environmental Systems AP 2 Manual Page 26 Figure 9 AP 2 Assembly Well Cap with Holes...
Страница 38: ...QED Environmental Systems AP 2 Manual Page 30 Figure 11 Examples of Well Caps...
Страница 40: ...QED Environmental Systems AP 2 Manual Page 32 Figure 12 Hose Bundling Part 1 of 2...
Страница 53: ...Page 45 AP 2 Manual Revision 7 August 2007 Chapter 6 Maintenance Figure 14 Removing AP 2 Pump Casing...
Страница 54: ...QED Environmental Systems AP 2 Manual Page 46 Figure 15 Exploded view of a Long Top Loading AutoPump AP 2...
Страница 56: ...QED Environmental Systems AP 2 Manual Page 48 Figure 17 Exploded View of a Long Bottom Loading AutoPump AP 2...
Страница 58: ...QED Environmental Systems AP 2 Manual Page 50 Figure 19 Exploded View of AP 2 Lever Assembly...
Страница 82: ...QED Environmental Systems AP 2 Manual Page 74 Figure 29 Conversion From Top Loading to Bottom Loading AutoPump...
Страница 102: ...QED Environmental Systems AP 2 Manual Page 94 Figure 37 Pump Cycle Counter with Magnetic Reed Switch...
Страница 109: ...Page 101 AP 2 Manual Revision 7 August 2007 Log Notes...
Страница 110: ...Clean Environment Equipment AP 2 Manual Page 102...
Страница 111: ...Page 103 AP 2 Manual Revision 7 August 2007 Log Notes...