Clean Environment Equipment
AP-2 Manual
Page 100
4. After obtaining authorization from QED, sending the malfunctioning
component via a RMA# (Return Material Authorization number) to the
address below or to its appointed agent:
QED Environmental Systems
1133 Seventh Street
Oakland, CA 94607
USA
(800) 537-1767
Toll-Free in North America
(510) 891-0880
(510) 444-6789
FAX
5. Equipment must be cleaned before shipment or it will be cleaned by QED
before any work is performed. The customer will be charged for such
cleaning.
If any product covered hereby is actually defective within the terms of this warranty,
purchaser must contact QED, or its appointed agent, for determination of warranty
coverage. If the return of a component is determined to be necessary, QED, or its
appointed agent, will authorize the return of the component at Purchasers expense. If
the product proves not to be defective within the terms of this warranty, then all costs
and expenses in connection with the processing of the Purchaser’s claim and all costs
for repair, parts, labor, and shipping and handling, as authorized by owner hereunder,
shall be borne by the Purchaser. In no event shall such allegedly defective products
be returned to QED, or its appointed agent, without its consent, and QED’s, or its
appointed agent’s, obligations of repair, replacement or refund are conditional upon
the buyer’s return of the defective product to QED, or its appointed agent. All
equipment returned to QED will be appropriately cleaned of contamination before
shipping.
Содержание AutoPump AP-2
Страница 15: ...Page 7 AP 2 Manual Revision 7 August 2007 Figure 1 How it Works Chapter 2 Overview 601345...
Страница 17: ...Page 9 AP 2 Manual Revision 7 August 2007 Figure 2 Overview of the AutoPump System Chapter 2 Overview...
Страница 22: ...QED Environmental Systems AP 2 Manual Page 14 Figure 3 Long and Short Bottom Loading AP 2 BL...
Страница 23: ...Page 15 AP 2 Manual Revision 7 August 2007 Chapter 3 Equipment Figure 4 Long and Short Top Loading AP 2 TL...
Страница 32: ...QED Environmental Systems AP 2 Manual Page 24 Figure 7 Locking Quick Connects...
Страница 34: ...QED Environmental Systems AP 2 Manual Page 26 Figure 9 AP 2 Assembly Well Cap with Holes...
Страница 38: ...QED Environmental Systems AP 2 Manual Page 30 Figure 11 Examples of Well Caps...
Страница 40: ...QED Environmental Systems AP 2 Manual Page 32 Figure 12 Hose Bundling Part 1 of 2...
Страница 53: ...Page 45 AP 2 Manual Revision 7 August 2007 Chapter 6 Maintenance Figure 14 Removing AP 2 Pump Casing...
Страница 54: ...QED Environmental Systems AP 2 Manual Page 46 Figure 15 Exploded view of a Long Top Loading AutoPump AP 2...
Страница 56: ...QED Environmental Systems AP 2 Manual Page 48 Figure 17 Exploded View of a Long Bottom Loading AutoPump AP 2...
Страница 58: ...QED Environmental Systems AP 2 Manual Page 50 Figure 19 Exploded View of AP 2 Lever Assembly...
Страница 82: ...QED Environmental Systems AP 2 Manual Page 74 Figure 29 Conversion From Top Loading to Bottom Loading AutoPump...
Страница 102: ...QED Environmental Systems AP 2 Manual Page 94 Figure 37 Pump Cycle Counter with Magnetic Reed Switch...
Страница 109: ...Page 101 AP 2 Manual Revision 7 August 2007 Log Notes...
Страница 110: ...Clean Environment Equipment AP 2 Manual Page 102...
Страница 111: ...Page 103 AP 2 Manual Revision 7 August 2007 Log Notes...