Page 43
AP-2 Manual
Revision 7 - August, 2007
Chapter 6: Maintenance
AutoPump Service
AutoPump Shutdown and Removal from Well
To shut down and remove the AutoPump, follow these directions:
STEP 1 -
Wait until the pump is in its discharge cycle and then raise it above the
water level in the well. This will empty most of the fluid from the pump
making it lighter to lift. There will also be less fluid to drain from the
pump.
Note:
See Start Up and Operation for optional pump removal technique.
STEP 2 -
Pull the pump and hoses to the surface.
STEP 3 -
Shut off the air to the pump and disconnect the air hose from the pump.
STEP 4 -
Ensure that there is a safe place to drain any fluid from the pump and
discharge hose.
STEP 5 -
Disconnect the fluid discharge hose from the pump.
STEP 6 -
Drain the fluid by turning the pump upside-down and allowing fluid to
flow from the air inlet fitting.
Caution:
Wear gloves and catch the draining fluid in a sump or bucket.
Removing Pump Casing
Follow these instructions for removing the pump casing:
Caution:
When assembling or disassembling the pump, do not rotate the casing. If
the casing is turned and if any resistance is felt, stop. This action may cause
the float and control rod to rotate with the casing. Instead of rotating the
casing, spin the bottom check valve (or plug on a Top-Loading pump) and
hold the casing stationary.
Caution:
After troubleshooting is completed and before assembling the pump, slowly
move the float through its range to ensure that the lever trips, even if the
pump fills and empties slowly.
Содержание AutoPump AP-2
Страница 15: ...Page 7 AP 2 Manual Revision 7 August 2007 Figure 1 How it Works Chapter 2 Overview 601345...
Страница 17: ...Page 9 AP 2 Manual Revision 7 August 2007 Figure 2 Overview of the AutoPump System Chapter 2 Overview...
Страница 22: ...QED Environmental Systems AP 2 Manual Page 14 Figure 3 Long and Short Bottom Loading AP 2 BL...
Страница 23: ...Page 15 AP 2 Manual Revision 7 August 2007 Chapter 3 Equipment Figure 4 Long and Short Top Loading AP 2 TL...
Страница 32: ...QED Environmental Systems AP 2 Manual Page 24 Figure 7 Locking Quick Connects...
Страница 34: ...QED Environmental Systems AP 2 Manual Page 26 Figure 9 AP 2 Assembly Well Cap with Holes...
Страница 38: ...QED Environmental Systems AP 2 Manual Page 30 Figure 11 Examples of Well Caps...
Страница 40: ...QED Environmental Systems AP 2 Manual Page 32 Figure 12 Hose Bundling Part 1 of 2...
Страница 53: ...Page 45 AP 2 Manual Revision 7 August 2007 Chapter 6 Maintenance Figure 14 Removing AP 2 Pump Casing...
Страница 54: ...QED Environmental Systems AP 2 Manual Page 46 Figure 15 Exploded view of a Long Top Loading AutoPump AP 2...
Страница 56: ...QED Environmental Systems AP 2 Manual Page 48 Figure 17 Exploded View of a Long Bottom Loading AutoPump AP 2...
Страница 58: ...QED Environmental Systems AP 2 Manual Page 50 Figure 19 Exploded View of AP 2 Lever Assembly...
Страница 82: ...QED Environmental Systems AP 2 Manual Page 74 Figure 29 Conversion From Top Loading to Bottom Loading AutoPump...
Страница 102: ...QED Environmental Systems AP 2 Manual Page 94 Figure 37 Pump Cycle Counter with Magnetic Reed Switch...
Страница 109: ...Page 101 AP 2 Manual Revision 7 August 2007 Log Notes...
Страница 110: ...Clean Environment Equipment AP 2 Manual Page 102...
Страница 111: ...Page 103 AP 2 Manual Revision 7 August 2007 Log Notes...