Page 41
AP-2 Manual
Revision 7 - August, 2007
Maintenance Table
A visual check and/or maintenance is recommended at least once every two weeks, but
some site environments may demand more frequent service. The following table outlines the
recommended minimum schedule for the AP-2 System.
* Site conditions may require maintenance more often.
The following sections describe each maintenance activity in detail.
Air Quality Check
Single Stage Filter/Regulator Maintenance
Even using air which has some oil and water in it, the AutoPump System should operate
trouble-free for years. The air filter is normally a 5 micron filter with a replaceable
element.
To replace the element in the
air filter
on the single stage filter/regulator
use the following
procedure:
STEP 1 - Disconnect Air Source
•
Valve off the air supply and drain the downstream air to the air filter.
Or disconnect the blue system air supply hose from the single stage
filter/regulator. The
air filters will depressurize, allowing them to be
safely serviced.
WARNING:
Do not remove a filter bowl that is pressurized.
X
X
Equipment
Air Quality Check
• Single Stage Filter/Regulator
AutoPump Service
Check Pump Cycle Counter
Check Volume Pumped Per Cycle
Biweekly
Monthly*
As Required
X
X
Chapter 6: Maintenance
Содержание AutoPump AP-2
Страница 15: ...Page 7 AP 2 Manual Revision 7 August 2007 Figure 1 How it Works Chapter 2 Overview 601345...
Страница 17: ...Page 9 AP 2 Manual Revision 7 August 2007 Figure 2 Overview of the AutoPump System Chapter 2 Overview...
Страница 22: ...QED Environmental Systems AP 2 Manual Page 14 Figure 3 Long and Short Bottom Loading AP 2 BL...
Страница 23: ...Page 15 AP 2 Manual Revision 7 August 2007 Chapter 3 Equipment Figure 4 Long and Short Top Loading AP 2 TL...
Страница 32: ...QED Environmental Systems AP 2 Manual Page 24 Figure 7 Locking Quick Connects...
Страница 34: ...QED Environmental Systems AP 2 Manual Page 26 Figure 9 AP 2 Assembly Well Cap with Holes...
Страница 38: ...QED Environmental Systems AP 2 Manual Page 30 Figure 11 Examples of Well Caps...
Страница 40: ...QED Environmental Systems AP 2 Manual Page 32 Figure 12 Hose Bundling Part 1 of 2...
Страница 53: ...Page 45 AP 2 Manual Revision 7 August 2007 Chapter 6 Maintenance Figure 14 Removing AP 2 Pump Casing...
Страница 54: ...QED Environmental Systems AP 2 Manual Page 46 Figure 15 Exploded view of a Long Top Loading AutoPump AP 2...
Страница 56: ...QED Environmental Systems AP 2 Manual Page 48 Figure 17 Exploded View of a Long Bottom Loading AutoPump AP 2...
Страница 58: ...QED Environmental Systems AP 2 Manual Page 50 Figure 19 Exploded View of AP 2 Lever Assembly...
Страница 82: ...QED Environmental Systems AP 2 Manual Page 74 Figure 29 Conversion From Top Loading to Bottom Loading AutoPump...
Страница 102: ...QED Environmental Systems AP 2 Manual Page 94 Figure 37 Pump Cycle Counter with Magnetic Reed Switch...
Страница 109: ...Page 101 AP 2 Manual Revision 7 August 2007 Log Notes...
Страница 110: ...Clean Environment Equipment AP 2 Manual Page 102...
Страница 111: ...Page 103 AP 2 Manual Revision 7 August 2007 Log Notes...