QED Environmental Systems
AP-2 Manual
Page 22
Chapter 4: Assembly & Installation
WARNING:
PVC pipe is generally not recommended for compressed air service.
Cautions
The following suggestions are offered to reduce the complications involved in assembly and
installation.
• Cover the hose ends with tape if they are being pulled through trenches. Be sure the ends
of the hoses that connect to the air compressor and fluid discharge have the correct fitting
leading out of the well. If you are unsure, look at the respective fittings on the pump.
• Blow out all water and particles from compressed air conduits (trunk lines, sensor hoses, air
supply hoses etc.) and fluid lines for at least 10 seconds after the water and particles exit
before connecting them to the system.
• When running hoses in conduit, include a rope to pull additional hoses in case they are
needed at a later date
• If solid metal piping is used for compressed air conduit, it is advised that an air filter or a
“Y” strainer with a fine mesh screen (80 mesh or finer) be placed at the downstream end
of the piping. Metal flakes, rust, galvanizing material, dirt, etc. can be dislodged from such
metal piping and travel to the pump.
Содержание AutoPump AP-2
Страница 15: ...Page 7 AP 2 Manual Revision 7 August 2007 Figure 1 How it Works Chapter 2 Overview 601345...
Страница 17: ...Page 9 AP 2 Manual Revision 7 August 2007 Figure 2 Overview of the AutoPump System Chapter 2 Overview...
Страница 22: ...QED Environmental Systems AP 2 Manual Page 14 Figure 3 Long and Short Bottom Loading AP 2 BL...
Страница 23: ...Page 15 AP 2 Manual Revision 7 August 2007 Chapter 3 Equipment Figure 4 Long and Short Top Loading AP 2 TL...
Страница 32: ...QED Environmental Systems AP 2 Manual Page 24 Figure 7 Locking Quick Connects...
Страница 34: ...QED Environmental Systems AP 2 Manual Page 26 Figure 9 AP 2 Assembly Well Cap with Holes...
Страница 38: ...QED Environmental Systems AP 2 Manual Page 30 Figure 11 Examples of Well Caps...
Страница 40: ...QED Environmental Systems AP 2 Manual Page 32 Figure 12 Hose Bundling Part 1 of 2...
Страница 53: ...Page 45 AP 2 Manual Revision 7 August 2007 Chapter 6 Maintenance Figure 14 Removing AP 2 Pump Casing...
Страница 54: ...QED Environmental Systems AP 2 Manual Page 46 Figure 15 Exploded view of a Long Top Loading AutoPump AP 2...
Страница 56: ...QED Environmental Systems AP 2 Manual Page 48 Figure 17 Exploded View of a Long Bottom Loading AutoPump AP 2...
Страница 58: ...QED Environmental Systems AP 2 Manual Page 50 Figure 19 Exploded View of AP 2 Lever Assembly...
Страница 82: ...QED Environmental Systems AP 2 Manual Page 74 Figure 29 Conversion From Top Loading to Bottom Loading AutoPump...
Страница 102: ...QED Environmental Systems AP 2 Manual Page 94 Figure 37 Pump Cycle Counter with Magnetic Reed Switch...
Страница 109: ...Page 101 AP 2 Manual Revision 7 August 2007 Log Notes...
Страница 110: ...Clean Environment Equipment AP 2 Manual Page 102...
Страница 111: ...Page 103 AP 2 Manual Revision 7 August 2007 Log Notes...