![Promise Technology VTrak D5000 Series Скачать руководство пользователя страница 133](http://html.mh-extra.com/html/promise-technology/vtrak-d5000-series/vtrak-d5000-series_product-manual_1617263133.webp)
Enable/Disable Scheduled Background Activity
Background activity schedules are enabled by default when you create the schedule. If you want to stop a
background activity now but plan to use it again in the future, disable the scheduled activity rather than deleting it.
To enable or disable change an existing scheduled background activity:
1.
Click the
Administration
tab.
2.
Click the
Background Activities
tab.
The list of background appears.
3.
Click the
Scheduler
button.
The list of currently scheduled background activities appears.
4. Click the background activity and click the
Settings
button.
5. Uncheck the E
nable This Schedule
box to disable this schedule.
Check the box to enable this schedule.
6.
Click the
Save
button.
Delete a Scheduled Background Activity
To change an existing scheduled background activity:
1.
Click the
Administration
tab.
2.
Click the
Background Activities
tab.
The list of background appears.
3.
Click the
Scheduler
button.
The list of currently scheduled background activities appears.
4. Click the background activity and click the
Delete
button.
5. In the confirmation box, click the confirm button.
124
Promise
Technology
VTrak D5000 Series
Содержание VTrak D5000 Series
Страница 16: ...Front view of VTrak D5600 Drive carriers Enclosure Power and Status LEDs 7 Promise Technology Introduction ...
Страница 170: ...Examples event event v event c 200 event a list i 852 c 200 161 Promise Technology Managing with CLI ...
Страница 218: ...Examples spare spare a add p 14 t g spare a del i 0 209 Promise Technology Managing with CLI ...
Страница 233: ...Examples ups v ups a mod s ups1 192 168 1 1 rtr 5 224 Promise Technology VTrak D5000 Series Product Manual ...
Страница 245: ...236 Promise Technology VTrak D5000 Series Product Manual ...