![PRIMERGY BladeFrame BF200 Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/primergy/bladeframe-bf200/bladeframe-bf200_initial-setup-manual_1601712051.webp)
Installing the Hardware
Release 5.0
3-13
b.
Secure the front of each rail to the rack using the screws
provided.
c.
Secure the back of each rail to the rack using the screws
provided.
d.
Secure the screws that attach the rear rail extenders to the
front part of the rails.
2.
If you are installing more than one BladeFrame BF200 in your
rack, leave a 1U gap between each chassis (see Figure 3.7.) This
allows for the subsequent installation of redundant power
supplies For more detail on installing redundant power supplies,
see “
Providing Redundant Input Power
Note:
The redundant power option is not available with systems
sold outside of North America.
5.
Mount the server (see
Installing the Chassis
).
6.
Route the cables as described in the original manual of the Rack.
Содержание BladeFrame BF200
Страница 2: ......
Страница 4: ......
Страница 8: ...Initial Setup Guide cBlade ES vi...
Страница 20: ...Initial Setup Guide cBlade ES 1 6 Release 5 0...
Страница 78: ...Initial Setup Guide cBlade ES 4 14 Release 5 0...
Страница 110: ...Initial Setup Guide cBlade ES 5 32 Release 5 0...
Страница 114: ...Initial Setup Guide cBlade ES Index 4...