Initial Setup Guide cBlade ES
4-12
Release 5.0
2.
Attach the STS to the rack using the rail mounting kit provided.
3.
Connect the STS output cable to the IEC power receptacle at the
rear of the BladeFrame BF200.
Figure 4.7 Cable Management
4.
Connect the STS cable marked
Input Source A
to a single
independent AC power source. (See Figure 4.8.)
5.
Connect the STS cable marked
Input Source B
to another
independent AC power source.(See Figure 4.8.)
Note:
Do not connect the STS
Input Source A
cable and the
Input Source B
cable to the same AC power source.
For full STS operating characteristics, see
APC Redundant
Switch Users Manual
. Use the factory settings for normal STS
operation.
The accessory kit contains
velcro cable ties that can
be attached to the four
cable management points
on the back of the chassis.
Dress the cables neatly
to avoid interference while
servicing the back of the
chassis
.
Cable Management Points
Содержание BladeFrame BF200
Страница 2: ......
Страница 4: ......
Страница 8: ...Initial Setup Guide cBlade ES vi...
Страница 20: ...Initial Setup Guide cBlade ES 1 6 Release 5 0...
Страница 78: ...Initial Setup Guide cBlade ES 4 14 Release 5 0...
Страница 110: ...Initial Setup Guide cBlade ES 5 32 Release 5 0...
Страница 114: ...Initial Setup Guide cBlade ES Index 4...