Table CN-01 – AC Grid Connections
(*)
IMPORTANT
: If several Aurora inverters are installed in a tree-phase
AC GRID, it is recommended to distribute the inverters between the phases
in order to reduce the power unbalances between the phases. Always refer to
the local standards.
3.3.7
Connection of RS485 and Alarm contact
WARNING
: Before performing the following instructions, ALWAYS
perform the “AURORA ELECTRICAL DISCONNECT PROCEDURE”
described in section 3.3.1 of this manual.
Step 1: Remove the Switch Box front panel (remove the 4 screws in pos “B” of
Fig. 10). Remove also the cover of the Aurora inverter (Ref. Fig. 14 / screw pos. "A")
in order to gain access to the terminal block board.
Содержание AURORA PVI-3.0-OUTD-S-US
Страница 52: ...Installation and Operator s Manual Page 52 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 Fig 17 USB Port ...
Страница 80: ...Installation and Operator s Manual Page 80 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 ...
Страница 104: ...Installation and Operator s Manual Page 104 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 ...
Страница 105: ...Installation and Operator s Manual Page 105 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 ...
Страница 106: ...Installation and Operator s Manual Page 106 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 ...
Страница 107: ...Installation and Operator s Manual Page 107 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 ...
Страница 108: ...Installation and Operator s Manual Page 108 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 ...