Installation and Operator’s Manual
Page 69 of 108
(PVI-3.0/3.6/4.2-OUTD-x-US Rev: 2.1)
5.5.6.2
Partial
Select Partial to view the following information:
Time: Total operation time since counter was last reset *
E-par: Total energy output since counter was last reset *
PPeak: Maximum peak power measured since Partial counter was activated
Val.: Money earned since counter was last reset *
CO2: CO2 saving compared to fossil fuels since counter was last reset *
* Hold the ENTER key (4th key from display) depressed for over 3 seconds to reset all
counters in this submenu. After 3 seconds, a warning sound is repeated 3 times.
5.5.6.3
Today
Select Today to view the following information:
E-tod: Total energy output during the day
Ppeak: Peak power achieved during the day
Val: Money earned during the day
CO2: CO2 saving compared to fossil fuels during the day
5.5.6.4
Last 7 days
Select Last 7 days to view the following information:
E-7d: Total energy output during the last 7 days
Val.: Money earned during the last 7 days
CO2: CO2 saving compared to fossil fuels during the last 7 days
E-7d
KWh
Val. $
CO2 lb
E-tod
KWh
Ppeak W
Val. $
CO2 lb
Time
h
E-par
KWh
Ppeak W
Val. $
CO2 lb
Содержание AURORA PVI-3.0-OUTD-S-US
Страница 52: ...Installation and Operator s Manual Page 52 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 Fig 17 USB Port ...
Страница 80: ...Installation and Operator s Manual Page 80 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 ...
Страница 104: ...Installation and Operator s Manual Page 104 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 ...
Страница 105: ...Installation and Operator s Manual Page 105 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 ...
Страница 106: ...Installation and Operator s Manual Page 106 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 ...
Страница 107: ...Installation and Operator s Manual Page 107 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 ...
Страница 108: ...Installation and Operator s Manual Page 108 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 ...