Installation and Operator’s Manual
Page 18 of 108
(PVI-3.0/3.6/4.2-OUTD-x-US Rev: 2.1)
3
INSTALLATION
WARNING
: The electrical installation of the Aurora inverter must be
performed in accordance with the electrical standards prescribed by the local
regulations and by the National Electric Code (ANSI/NFPA 70 standard).
WARNING
: The connection of an Aurora inverter to the electrical
distribution grid must be performed only after receiving authorization from
the utility that operates the grid.
3.1
Package Inspection
NOTE:
The distributor delivered your Aurora inverter to the carrier safely
packaged and in perfect condition. Upon acceptance of the package, the
carrier assumes responsibility for its safe delivery. In spite of careful
handling, transportation damage to the package or its contents is always a
possibility.
The customer is encouraged to perform the following checks:
•
Inspect the shipping box for apparent damage, such as holes, cracking, or any
other sign of possible damage to its contents.
•
Describe any damage or shortage on the receiving documents and have the carrier
sign his/her full name.
•
Open the shipping box and inspect the contents for internal damage. While
unpacking, be careful not to discard any equipment, parts, or manuals. If any
damage is detected, call the delivering carrier to determine the appropriate action.
Save all shipping material in the event that the carrier sends an inspector to verify
damage!
•
If the inspection reveals damage to the inverter, contact your supplier, or
authorized distributor. They will determine if the equipment should be returned
for repair. They will also provide instructions on how to get the equipment
repaired.
•
It is the customer's responsibility to file a claim with the carrier. Failure to file a
claim with the carrier may void all warranty service rights for any damage.
•
Save the Aurora inverter's original shipping package in the event that you should
ever need to return the inverter for repair.
Содержание AURORA PVI-3.0-OUTD-S-US
Страница 52: ...Installation and Operator s Manual Page 52 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 Fig 17 USB Port ...
Страница 80: ...Installation and Operator s Manual Page 80 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 ...
Страница 104: ...Installation and Operator s Manual Page 104 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 ...
Страница 105: ...Installation and Operator s Manual Page 105 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 ...
Страница 106: ...Installation and Operator s Manual Page 106 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 ...
Страница 107: ...Installation and Operator s Manual Page 107 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 ...
Страница 108: ...Installation and Operator s Manual Page 108 of 108 PVI 3 0 3 6 4 2 OUTD x US Rev 2 1 ...