background image

Dokument

 

D

GB-0600 Dokum D Anbaugeräte

-  -

ALOIS PÖTTINGER Maschinenfabrik GmbH
A-4710 Grieskirchen
Tel. (07248) 600 -0
Telefax (07248) 600-511
GEBR. PÖTTINGER GMBH
D-86899 Landsberg/Lech, Spöttinger-Straße 24
Telefon (0 81 91) 92 99-111 / 112
Telefax (0 81 91) 92 99-188

GEBR. PÖTTINGER GMBH
Servicezentrum
D-86899 Landsberg/Lech, Spöttinger-Straße 24
Telefon (0 81 91) 92 99-10 / 21
Telefax (0 81 91) 59 656

 

Machine checked according to delivery note. All attached parts removed. All safety equipment, drive shaft and operating 

devices at hand. 

 

Operation and maintenance of machine and/or implement according to operating instructions explained to the customer. 

 

Tyres checked re. correct pressure. 

 

Wheel nuts checked re. tightness. 

 

Drive shaft cut to correct lenght.

 

Correct power-take-off speed indicated. 

 

Fitting to tractor carried out: to three-point linkage

 

Trial run carried out and no defects found. 

 

Functions explained during trial run. 

 

Pivoting in transporting and operating position explained. 

 

Information given re. optional extras. 

 

Absolute need to read the operating manual indicated. 

Please check. 

     

X

According to the product liability please check the above mentioned items. 

INSTRUCTIONS FOR 
PRODUCT DELIVERY

GB

In order to prove that the machine and the operating manual have been properly delivered, a confirmation is necessary.
For this purpose please do the following:
-  sign the 

document A 

and send it to the company Pöttinger

  (in case of Landsberg equipment: to the company Landsberg)

document B

 stays with the specialist factory delivering the machine.

document C

 stays with the customer.

Содержание HIT 610 N

Страница 1: ...our Votre Masch Nr Fgst Ident Nr 3425 4 3 2 02 5 4 6 29 0AGE 4RANSLATION OF THE ORIGINAL PERATING ANUAL Ihre Your Votre Masch Nr Fgst Ident Nr R Tedder 99 2181 GB 80I 0 HIT 610 N Type ZK 2181 01001 HI...

Страница 2: ...damage is damage caused by a machine and not to it An excess of Euro 500 is provided for such a liabilioty In accordance with the laws of product liability entrepreneurial property damages are exclude...

Страница 3: ...s checked re tightness Drive shaft cut to correct lenght Correct power take off speed indicated Fitting to tractor carried out to three point linkage Trial run carried out and no defects found Functio...

Страница 4: ...n 7 Winter storage 7 ADJUSTMENTS BEFORE OPERATION Safety hints 8 Adjustment of rotor inclination 8 Tine inclination 8 Driving on public roads 8 Transport position Driving on public roads 9 Conversion...

Страница 5: ...t be checked and adjusted if necessary see also supplement B Drive shaft adaption Connecting hydraulic system to the tractor For reasons of accident prevention the p t o must be switched off and the r...

Страница 6: ...it is necessary to have a second simple functioning hydraulic connectiononthetractor Thetwo waystopcock H2 isconnected to this If the tractor only has one hydraulic connection then instead of a two w...

Страница 7: ...posed parts from rust Lubricate all greasing points according to lubrication chart Park machine with liftet rotors which will protect plunger from rust FETT W TD7 95 5 Lowering the rotary tedder The m...

Страница 8: ...nclination is correct see chapter USE S1 S2 80 TD 16 96 2 R Safety hints All work in the immediate area of the rotors may only be carried out when the p t o is switched off Caution Do not enter rotor...

Страница 9: ...209 a GB Transport position Driving on public roads Safety Precaution Changingfromworkingpositiontotransportposition is only to be carried out on even firm ground Only transport the machine in the tra...

Страница 10: ...nd on the two centre wheels 2 EUROHIT 69 AZ EUROHIT 80 AZ Pull rope S The stop function is raised 3 Outer rotors are swivelled up into transport position by operating servo valve ST 4 Release rope dur...

Страница 11: ...B 11 Beleuchtung F D GB Eclairage Removable lightning Warntafeln Tableau de signalisation Warning plates Einzelteile siehe Ersatzteilliste Pi ces d tach e voir liste des pi ces de rechange For single...

Страница 12: ...209 BELEUCHTUNG 9600 D F GB 12 Beleuchtung F D GB Eclairage Removable lightning...

Страница 13: ...sition 1 Firstly lower the whole implement to the ground using the tractor s lifting gear The implement must stand on the ground on the two centre wheels with the outer rotors still swivelled up 2 Onl...

Страница 14: ...tion If working on slopes this can lead to dangerous situations partly due to the balance weight of the implement tipping slipping material breakage etc The function of the shock absorbtion struts is...

Страница 15: ...swingtherunnerwheelleftmoveservo valveto lift position To swing runner wheel right move servo valve to lower position 3 Swinging the runner wheel mechanically on machines with central adjusting equipm...

Страница 16: ...e tine carrier 80 Position S1 Standard position ex factory Position S2 For use under difficult conditions e g with very dense awkward forage This tine position increases the strewing action Direction...

Страница 17: ...lubricant oil into the intake transmission see enclosure on fuel regulation Changing tines Remove broken tine after loosening the hexagonal nut and fit new tine For correct fitting observe the directi...

Страница 18: ...he keeping of operating service and maintenance requirements layed down by the manufacturer also come under the heading of defined use Technical data Necessary connections 1 single action hyfraulic co...

Страница 19: ...GB Anhang Titelblatt _BA Allgemein GB Supplement...

Страница 20: ...heap buy can sometimes be very expensive Be sure you purchase the Original with the cloverleaf sym bol Quality and precise fitting Operating safety Reliable operation Longer lasting Economy Guaranteed...

Отзывы: