![Porsche 911 GT3 Cup 2018 Скачать руководство пользователя страница 304](http://html1.mh-extra.com/html/porsche/911-gt3-cup-2018/911-gt3-cup-2018_techical-manual_1580129304.webp)
Version: 4/20/2018
303
Bodywork
911 GT3 Cup (991 II)
MY 2018
4.17
Installing roof assembly
Preparation measure
Toxic substances
Poisoning or suffocation
Burns to the eyes and skin
•
Ventilate the work area well.
•
Never ingest or inhale.
•
Read specific information on the Hazard Sheet.
•
Do not smoke, eat, or drink in the work area.
Application of adhesive
Poor adhesive bond
Roof module becomes detached
•
Fixing time: Approx. 1 hour.
•
The vehicle must not be used until a curing time
of 2 hours has elapsed.
•
Processing temperature at least 10°C (50°F).
A drying time of at least 10 minutes must be observed between cleaning the frame
and applying primer! No cleaning solution residue may remain on the frame.
The adhesive has an open time of
15 min
, which means that the adhesive
must be applied and the component affixed within this period of time.
To ensure that the substance is completely mixed, apply a 30 mm long
bead of fresh adhesive to a piece of cardboard before processing.
NOTE
4.17.1
WARNING
Содержание 911 GT3 Cup 2018
Страница 1: ...Technical manual 911 GT3 Cup 991 II MY 2018 ...
Страница 17: ...Version 4 20 2018 911 GT3 Cup 991 II MY 2018 16 Preface ...
Страница 224: ...Version 4 20 2018 223 Bodywork 911 GT3 Cup 991 II MY 2018 Side view 4 2 2 ...
Страница 351: ...Version 4 20 2018 350 Electrical system 911 GT3 Cup 991 II MY 2018 ...
Страница 369: ...Version 4 20 2018 368 Maintenance 911 GT3 Cup 991 II MY 2018 7 1 1 1 60 sec ...