TRANSMISSION
8.2
TORQUE SPECIFICATIONS
Item
Specification
Transmission Case Bolts
12 Ft. Lbs. (16.5 Nm)
Bell Crank Nut
12 Ft. Lbs. (16.5 Nm)
Transimission Drain Plug
14 Ft. lbs. (19 Nm)
Transmission Mount Bolts
25 Ft. Lbs. (34.5 Nm)
Drive Sprocket Bolt
17 Ft. lbs. (23.5 Nm)
Output Shaft Bearing
Mounting Nuts
12 Ft. Lbs. (16.5 Nm)
Swing Arm Pivot Bolts
(Concentric Swingarm)
150 Ft. Lbs. (207.5 Nm)
LUBRICATION
Refer to Maintenance Chapter 2 for transmission
lubricant type and capacity.
TRANSMISSION REMOVAL
1. Remove seat, cab and air box.
2. Remove right side shield and auxiliary brake
master cylinder and reservoir.
3. Remove PVT outer cover, both drive and driven
clutch, and inner PVT cover (refer to Clutch Chapter
6).
4. Remove rear PVT bracket.
5. Remove pin from front prop shaft at front housing.
Position U-joint to allow pin to clear skid plate.
6. Remove carburetor.
7. Disconnect harness from gear position switch.
8. Remove drive chain and sprocket.
9. Remove mounting bolts and brackets as shown.
10. Remove
through-bolt
from
bottom
of
transmission.
11. Loosen left side swingarm bolt until clear of
transmission case.
12. Remove recoil.
13. Remove transmission from right side of frame.
TRANSMISSION
INSTALLATION
1. Reverse removal steps to install transmission.
NOTE: Install Center Distance Tool (PN 2871710) on
engine and transmission input shaft before tightening
transmission mounting bolts.
Align clutches as
outlined in Clutch Chapter 6.
Содержание A09BA50FA
Страница 63: ...ENGINE 3 13 EH50PL ENGINE EXPLODED VIEW Crankcase Cylinder Cylinder Head Crankshaft and Piston Valve Train A...
Страница 70: ...ENGINE 3 20 CYLINDER HEAD EXPLODED VIEW EH50PL EH50PL...
Страница 120: ...FUEL SYSTEM CARBURETION 4 16 NOTES...
Страница 216: ...BRAKES 9 24 NOTES...
Страница 254: ...ELECTRICAL 10 38 NOTES...
Страница 255: ...ELECTRICAL WIRING DIAGRAM 2009 SCRAMBLER 500...
Страница 256: ...ELECTRICAL WIRING DIAGRAM 2009 SCRAMBLER 500...