ELECTRICAL
10.15
CRANKING OUTPUT TEST
WITH PEAK READING
VOLTMETER
The following peak voltage tests will measure the
amount of output directly from each component. A
peak reading voltmeter should be used to perform the
CDI output test. A variety of peak reading adaptors
are commercially available for use with the Fluke
t
77
Digital Multimeter (PV--43568) and other digital VOMs
which will allow peak voltage tests to be performed
accurately. Follow the directions provided with the
adaptor. All measurements are indicated in DC Volts.
Readings obtained without a peak reading adaptor will
be significantly different.
The starter system must be in good condition, engine
undamaged and the battery fully charged.
240 Watt 4 Stroke (500)
Test
Connect
Meter Wires
To:
Reading
(Without Peak
Reading Volt
meter)
Cranking
Voltage
Red on CDI
connector and
ground
6--9 DCV
CDI OUTPUT TEST USING
PEAK READING ADAPTOR
Re-connect all CDI wires. Disconnect CDI module
wire from ignition coil primary terminal. Connect one
meter lead to engine ground and the other to the
ignition coil primary wire leading from the CDI module.
Crank engine and check output of CDI wire to coil.
Reconnect coil wire to CDI when finished.
Average Output w/ Peak output tester
130 DCV
Average Output w/ Digital Voltmeter
20 DCV
LIMITER SPECIFICATIONS
Speed Limiter
Module LR
ID Number
Part number is printed
on module
NOTE:The part number is printed on some late model
LR modules. Whenever possible, use that part number
to identify the module. Modules may have same “LR”
I.D. number, but may have different part numbers,
terminals, and internal functions.
LIMITER SPECIFICATIONS
Refer to parts manual or microfiche
for part number and application.
FUNCTION / LIMIT RPM
COMMENTS
Reverse Limit - 3100
Scrambler 500
GEAR POSITION INDICATOR
SWITCH TEST
Switch Continuity Table/Switch Schematic
High Range
Neutral
Reverse
F
F
F F
D C B
A
F
F
High/Neutral/Reverse Switch
Содержание A09BA50FA
Страница 63: ...ENGINE 3 13 EH50PL ENGINE EXPLODED VIEW Crankcase Cylinder Cylinder Head Crankshaft and Piston Valve Train A...
Страница 70: ...ENGINE 3 20 CYLINDER HEAD EXPLODED VIEW EH50PL EH50PL...
Страница 120: ...FUEL SYSTEM CARBURETION 4 16 NOTES...
Страница 216: ...BRAKES 9 24 NOTES...
Страница 254: ...ELECTRICAL 10 38 NOTES...
Страница 255: ...ELECTRICAL WIRING DIAGRAM 2009 SCRAMBLER 500...
Страница 256: ...ELECTRICAL WIRING DIAGRAM 2009 SCRAMBLER 500...