TRANSMISSION
8.4
7. Remove output shaft and gear assembly along with
sprocket and chain, by tapping on shaft with a soft
faced hammer, from the back side of the gear
case.
8. Remove roller chain. Note position of sprockets
and gear. Stretch chain tight on a flat surface and
measure the length of 8 pitches in a minimum of
three places on chain.
Replace chain if
measurement is longer than 5.05
I
(128.27 mm).
Measure
8 pitches
Chain Stretch Limit
8 pitch length =
5.05
I
(128.27 mm) Maximum
9. Use a 1/2
″
wrench to rotate bell crank and remove
shift fork, upper shaft assembly, reverse chain
and shaft.
10. Inspect shift fork surface for wear or damage.
Replace if necessay.
11. Remove reverse shaft bearing.
Содержание A09BA50FA
Страница 63: ...ENGINE 3 13 EH50PL ENGINE EXPLODED VIEW Crankcase Cylinder Cylinder Head Crankshaft and Piston Valve Train A...
Страница 70: ...ENGINE 3 20 CYLINDER HEAD EXPLODED VIEW EH50PL EH50PL...
Страница 120: ...FUEL SYSTEM CARBURETION 4 16 NOTES...
Страница 216: ...BRAKES 9 24 NOTES...
Страница 254: ...ELECTRICAL 10 38 NOTES...
Страница 255: ...ELECTRICAL WIRING DIAGRAM 2009 SCRAMBLER 500...
Страница 256: ...ELECTRICAL WIRING DIAGRAM 2009 SCRAMBLER 500...