FINAL DRIVE
7.23
16--19 ft.lbs.
NOTE: The chain maybe installed at this point or later
in the procedure.
3.
Install the spacer and sprocket guard (D). Install
the sprocket guard nuts, torque to 25--30 ft.lbs.
(34--41 Nm).
4.
Install the O--ring (E), brake disc (F), and axle nut
(G) onto the axle.
G
F
E
5.
Install the retaining ring (H) onto the axle.
It
should fully seat into the groove.
6.
Turn the axle nut outward with a 1 3/4” Wrench
(PN 2870772) until the end of the axle nut (G) just
covers the retaining ring (H). The retaining ring
should still be visible under the axle nut from an
angle. Torque to 8--10 ft.lbs. (11--14 Nm)
H
7.
Torque the axle nut pinch bolt to 50 in.lbs. (6 Nm).
50 in.lbs.
H
8.
Reinstall the chain and master link.
To verify
proper chain tension, refer to Chapter 2 “DRIVE
CHAIN INSPECTION” for this procedure.
9.
Torque the eccentric clamp bolts to 35 ft.lbs. (47
Nm).
35 ft.lbs.
10. Install caliper, two mounting bolts and lock washers.
Torque mounting bolts to 18 ft.lbs. (25 Nm).
Содержание A09BA50FA
Страница 63: ...ENGINE 3 13 EH50PL ENGINE EXPLODED VIEW Crankcase Cylinder Cylinder Head Crankshaft and Piston Valve Train A...
Страница 70: ...ENGINE 3 20 CYLINDER HEAD EXPLODED VIEW EH50PL EH50PL...
Страница 120: ...FUEL SYSTEM CARBURETION 4 16 NOTES...
Страница 216: ...BRAKES 9 24 NOTES...
Страница 254: ...ELECTRICAL 10 38 NOTES...
Страница 255: ...ELECTRICAL WIRING DIAGRAM 2009 SCRAMBLER 500...
Страница 256: ...ELECTRICAL WIRING DIAGRAM 2009 SCRAMBLER 500...