ENGINE
3.10
CRANKSHAFT
STRAIGHTENING
Lubricate the bearings and clamp the crankshaft
securely in the Crankshaft Truing Stand (PN
2870569). Refer to the illustrations below.
Crankshaft Truing Stand
(PN 2870569)
NOTE:
The rod pin position in relation to the dial
indicator position tells you what action is required to
straighten the shaft.
A
B
HIGH .004 (.1mm)
HIGH .004 (.1mm)
SUPPORT CRANKSHAFT
HERE.
1.
To correct a situation like the one shown in the
illustration at right, strike the shaft at point A with a
brass hammer.
A
A
HIGH .002 (.05mm)
HIGH .005 (.13mm)
2.
To correct a situation like the one shown in the
illustration at right, squeeze the crankshaft at
point A. (Use tool from alignment kit).
A
HIGH .002 (.05mm)
HIGH .005 (.13mm)
A
3.
If the crank rod pin location is 180
_
from the dial
indicator (opposite that shown above), it will be
necessary to spread the crankshaft at position A
as shown in the illustration at right.
When
rebuilding and straightening a crankshaft, runout
must be as close to zero as possible.
NOTE:
Maximum allowable runout is .0024
I
.
ENGINE LUBRICATION -
EH50PL
Oil Type
Polaris Premium 4 Synthetic
. . . . . . . . . . . . .
(PN 2871281)
Capacity
Approximately
2
U.S.
. . . . . . . . . . . .
Quarts (1.9 l)
Filter
(PN 3084963)
. . . . . . . . . . . . . . . .
Filter Wrench
(PV--43527)
. . . . . . . .
*Drain Plug / Screen Fitting
14 ft. lbs. (19 Nm) (If
. .
fitting is removed, follow oil pump priming procedure).
*Oil Pressure Specification
20 PSI @ 5500
. . .
RPM, Polaris 0W--40 Synthetic (Engine Hot)
Содержание A09BA50FA
Страница 63: ...ENGINE 3 13 EH50PL ENGINE EXPLODED VIEW Crankcase Cylinder Cylinder Head Crankshaft and Piston Valve Train A...
Страница 70: ...ENGINE 3 20 CYLINDER HEAD EXPLODED VIEW EH50PL EH50PL...
Страница 120: ...FUEL SYSTEM CARBURETION 4 16 NOTES...
Страница 216: ...BRAKES 9 24 NOTES...
Страница 254: ...ELECTRICAL 10 38 NOTES...
Страница 255: ...ELECTRICAL WIRING DIAGRAM 2009 SCRAMBLER 500...
Страница 256: ...ELECTRICAL WIRING DIAGRAM 2009 SCRAMBLER 500...