CLUTCHING
6.23
6.
Install sheave onto puller.
7.
Install nut onto puller rod and tighten by hand.
Turn puller barrel for further tension if needed.
8.
Turn
clutch
sheave
counterclockwise
until
bushing is removed. Repeat Steps 5 - 8 for other
bushing.
9.
Remove nut from puller rod and set aside.
10. Remove adapters from puller.
11. Remove bushing and removal tool from adapters.
Discard bushing.
DRIVEN CLUTCH MOVEABLE
SHEAVE - BUSHING
INSTALLATION
Number Two Puller
Adapter (#10)
Piston Pin Puller
(PN 2870386)
1.
Working from the top, insert Number Two Puller
Adapter (#10) (PN 5020633) onto the puller. See
illustration at above.
2.
Start new bushing evenly in moveable sheave.
Apply Loctite
t
680 (PN 2870584) to the back
side of new bushing.
3.
Install sheave onto puller with new bushing
upward as shown. Install the Number Two Puller
Adapter (#10) (PN 5020633).
4.
Install nut onto puller rod and hand tighten against
installation tool.
Содержание A09BA50FA
Страница 63: ...ENGINE 3 13 EH50PL ENGINE EXPLODED VIEW Crankcase Cylinder Cylinder Head Crankshaft and Piston Valve Train A...
Страница 70: ...ENGINE 3 20 CYLINDER HEAD EXPLODED VIEW EH50PL EH50PL...
Страница 120: ...FUEL SYSTEM CARBURETION 4 16 NOTES...
Страница 216: ...BRAKES 9 24 NOTES...
Страница 254: ...ELECTRICAL 10 38 NOTES...
Страница 255: ...ELECTRICAL WIRING DIAGRAM 2009 SCRAMBLER 500...
Страница 256: ...ELECTRICAL WIRING DIAGRAM 2009 SCRAMBLER 500...