4.6 Pre-Install Checklist
Task
Status
Plan for location of Control Box:
Power to Control Box.
Close proximity to chargers.
Plan for Sentinel
™
Data Cable run to the 1
st
Sentinel
™
in each
bus.
Ensure enough Sentinel
™
Data Cable (CAT3) is ordered.
Gather all required tools and equipment:
Ladders and/or Scissor Lifts.
Power Tools – for mounting Control Box, etc.
Hand Tools – wire cutters, Phillips-head screwdriver.
Extension cords for temporary power.
Anchors for mounting components based on mounting wall.
Review:
UPS Battery Backup System for the Control Box (
Note
- comes
with iBOS® Pro 6 Series).
Get surge protection for the Scrolling Displays and/or Wireless
Touch Screen (not included).