Philadelphia Scientific
®
iBOS
®
Pro 6 Series Installation Manual
Page 19 of 84
3.6 Sentinel
™ Data Cable Requirements
Data Cables are required to be run from the Control Box to the first Sentinel
™ in a pool as well as from
Sentinel
™ to Sentinel™ for the rest of the chargers in the pool in a daisy chain method for a max of 50
Sentinels
™ per Bus. Model BOS-CB6700 has 4 Buses with a system max of 200 Sentinels™ and model
BOS-CB6710 has 7 buses with a system max of 350 Sentinels
™. Using non-approved cable may not work
and could void your warranty.
7’ (2.1 m) Sentinel™ Data Cables (supplied with each Sentinel™)
25’ (7.6 m) Sentinel™ Data Cables w/coupler (must be ordered)
BOS-143
100’ (30.5 m) Sentinel™ Data Cable w/coupler (1 per Bus is supplied with control box)
BOS-161
Custom Cable Kit (must be ordered)
BOS-159
You need to purchase enough cable to reach the first Sentinel
™ for
Each Bus
you are using.
Here are some sample layouts of a typical battery room layout.
Sample 1: Layout 2 pool on one bus.