12
INSTALLATION
1.
Removing the packing materials and tapes
Remove all transportation packaging materials and tapes. Open the doors and ventilate the unit. If the
outside panels are dirty, clean them with a diluted neutral dishwashing detergent. (Undiluted detergent
can damage the plastic components. For the dilution, refer to the instruction of the detergent.) After
the cleaning with the diluted detergent, always wipe it off with a wet cloth. Then wipe off the panels with
a dry cloth.
Note:
Remove the cable tie banding the power supply cord.
Prolonged banding may cause the corrosion of the cord
coating.
2.
Installing the unit
Stretch the leveling feet by rotating them to contact them to
the floor. Ensure the unit is horizontally. (Fig. 1)
3. Fixing the unit
Two fixtures are attached to the rear of the frame. Fix the
frame to the wall with these fixtures and rope or chain.
(Fig. 2)
Note:
Contact our sales representative or agent if the unit should
be fixed for earthquake resistant.
4. Ground (earth) the unit
The ground (earth) is for preventing the electric shock in
the case of the electrical insulation is unanticipated
degraded. Always ground the unit at the time of
installation.
■
A 3-prong plug with grounding pole, there is no need for
electric work for grounding.
■
If the power supply outlet is not grounded, it will be
necessary to install a ground by qualified engineers.
Installation of shelf
The position of shelf stopper
is changeable. Set the shelf
stopper at desired position. The shelf should be horizontal.
(MPR-S313 only)
Fig. 2
Fixture (back side)
Fig. 1
Leveling foot
Shrink
Stretch
Содержание MPR-S163 Series
Страница 2: ......